Delivery of the Capital Metro simulator

CORYS delivered the desk training simulator to Capital Metro, the public transportation operator in Austin, United States, as part of a broader project to install Enhanced Automatic Train Control on its rail infrastructure and rolling stock.

The simulator replicates the Stadler GTW multiple units and all the lines that connect the town of Leander to the Austin Convention Center, thanks to a total of some 32 miles of CGI.

The railway tracks and rolling stock on these lines were recently equipped with Positive Train Control (PTC), an Enhanced Automatic Train Control (E-ATC), according to the new requirements of the Federal Railroad Administration. These requirements are accompanied by a major restructuring of the rail infrastructure and rolling stock, for which Capital Metro’s operators need to be trained.

Similar Contents

cbg guinea orders corys simulators

CBG Guinea orders CORYS simulators

14 November 2024

CBG (Compagnie des Bauxites de Guinée), the largest bauxite producing company in Guinea and one of the largest in the...

cbg guinea orders corys simulators

CBG Guinea orders CORYS simulators

14 November 2024

CBG (Compagnie des Bauxites de Guinée), the largest bauxite producing company in Guinea and one of the largest in the...

join us at innotrans to see the future of driver training technology

Join us at InnoTrans to see the future of driver training technology!

11 September 2024

Visit us in French pavilion Hall 3.2 – 210 to get a look at the future of driver training technology. Unreal...

corys ertms evc software partnership with tryandcert picks up speed

CORYS’ ERTMS EVC software partnership with Try&Cert picks up speed

31 July 2024

In a partnership that is innovative in the rail industry, CORYS has teamed up with testing and certification organisation Try&Cert...

Language

Sign up for our newsletter

20% off

sale