Contract renewed with French Nuclear Safety Authority

CORYS has been providing theoretical and practical training to the French Nuclear Safety Authority (ASN) since 2016.

The contract has just been renewed for a period of 4 years.

This training takes the form of 2 sessions of 20 days per year and is given to future ASN inspectors. It covers the design and operation of Pressurized Water Reactors.

Theoretical notions, such as neutronics and materials, are followed by a practical, during normal and/or accidental operating phases, using our PWR-C1300 and PWR- EPR simulator.

Christian Leo, Power Simulation Vice President explains: “Using our simulation tools allows for learning in real-life situations, for a better understanding of nuclear power plant operation “.

Similar Contents

fuel loading machine simulator for the flamanville epr

Simulateur de machine de chargement de combustible pour l’EPR de Flamanville

12 January 2024

CORYS développe pour EDF un simulateur de formation pour les opérateurs de la chaine PMC (Manutention du Combustible) de la...

fuel loading machine simulator for the flamanville epr

Simulateur de machine de chargement de combustible pour l’EPR de Flamanville

12 January 2024

CORYS développe pour EDF un simulateur de formation pour les opérateurs de la chaine PMC (Manutention du Combustible) de la...

corys supports the epr2 nuclear reactor programme

CORYS accompagne le programme des réacteurs nucléaires EPR2

15 December 2023

Edvance a confié à CORYS fin 2023 le contrat pour la conception et la réalisation du simulateur d’ingénierie EPR2 en...

epr simulator commissioning at hinkley point corys

Mise en service du simulateur EPR à la centrale d’Hinkley Point

26 June 2022

Après 9 semaines d’installation et 5 semaines de Recette Site, la réception des 2 plateformes Gold et Bronze des simulateurs...

Language

Sign up for our newsletter

20% off

sale